Field Day
-
fd2025g fd2025g
Raising the crank up tower.
Raising the crank up tower.
-
20250628 20250628
Tom reading the rotor connections for the 6M beam
Tom reading the rotor connections for the 6M beam
-
20250628 20250628
Larry, Howard, and Trig setting up the QRP vertical
Larry, Howard, and Trig setting up the QRP vertical
-
img20250627080713 img20250627080713
Assembling the vertical antenna for the digital station; Robert (KFØAUI), Jim (KØNK) and Matt (KFØICI).
Assembling the vertical antenna for the digital station; Robert (KFØAUI), Jim (KØNK) and Matt (KFØICI).
-
img20250627100532 img20250627100532
Erecting the SSB station vertical; Jim (KØNK), Mike (NØTU)
Erecting the SSB station vertical; Jim (KØNK), Mike (NØTU)
-
20250628 20250628
Greg (KIØKK) and Ralph (NØKC) doing a little maintenance on the generator
Greg (KIØKK) and Ralph (NØKC) doing a little maintenance on the generator
-
20250628 20250628
Trig working on the grounding crew
Trig working on the grounding crew